What happens when a person buys a third story unit and fails to consider how they will get the furniture through the narrow door. The installation of a needle lifting beam and a capstan winch fixed to the lounge room floor helped the situation. This difficult access site restricted the use of cranes and conventional lifting equipment.
This project involved the installation of golf ball protection netting. Industrial rope access provided a practical and efficient solution for this limited vehicle access site.
This project involved routine maintenance of the warning lights on this 230 metre high Sydney television transmission tower. This work requires staff to be trained in Height Safety, Tower Climbing and Rescue Techniques.
This project involved the removal of vegetation from rail cuttings just north of Sydney. Rope access tree climbers used chainsaws and rigging equipment during this operation.
This project involved the installation of access ladders and platforms on the rail bridge over the Hawkesbury River just north of Sydney. The steel erection works required rope access riggers and boiler makers with rail mounted truck cranes to lift the sections into place.
This project involved the removal of a number of large speakers from the roof structure of the Campbelltown stadium. Rope access provided an efficient and safe method of accessing the under roof speakers.
This project for Sydney Festival required the design and installation of a temporary art work banner over Circular Quay. The banner's size of 50m x 4m and the fact that the façade is heritage listed made for some interesting design and installation problem solving.
This project involved the removal of hazardous rocks from rail cuttings using rock breakers and hand tools. Rope access provided an efficient and safe solution to this difficult access site.